§ 1-19. Comprehensive stormwater management plans.  


Latest version.
  • The City may develop comprehensive stormwater management plans to be approved by DEQ that meet the water quality objectives, quantity objectives, or both of this chapter:

    1.

    Such plans shall ensure that offsite reductions equal to or greater than those that would be required on each contributing site are achieved within the same HUC or within another locally designated watershed. Pertaining to water quantity objectives, the plan may provide for implementation of a combination of channel improvement, stormwater detention, or other measures that are satisfactory to the locality's VSMP authority to prevent downstream erosion and flooding.

    2.

    If the land use assumptions upon which the plan was based change or if any other amendments are deemed necessary by the locality's VSMP authority, such authority shall provide plan amendments to the department for review and approval.

    3.

    During the plan's implementation, the locality's VSMP authority shall document nutrient reductions accredited to the BMPs specified in the plan.

    4.

    State and federal agencies may develop comprehensive stormwater management plans, and may participate in locality-developed comprehensive stormwater management plans where practicable and permitted by the locality's VSMP authority.

    (Ord. No. 3337, 4-22-14, eff. 7-1-14)