§ 35.1-5. Proposed plan for providing facilities and services within the Sandbridge Special Service District.  


Latest version.
  • The plan is to accumulate dedicated revenue generated for use within the Sandbridge Special Service District to fund the creation and maintenance of a beach berm having an elevation approximately six (6) feet above mean sea level and a width of approximately fifty (50) feet from the nourishment line with a slope of approximately twenty to one (20:1) to the Atlantic Ocean. Implementation of the plan is expected to produce a designed dry beach area of approximately one hundred and twenty (120) feet, which in combination with the fifty-foot berm will yield a dry beach of approximately one hundred and seventy (170) feet at mean tide level. Actual or planned elevations, slopes and beach area may vary from time to time as determined by the district engineer of the Army Corp of Engineers, Norfolk District, and the city's director of public works. In addition to nourishment activities, the Special Service District shall also provide services for the beautification, access, and upkeep of the beach berm.

    (Ord. No. 2297, 11-1-94; Ord. No. 3502, 5-9-17)

(Ord. No. 2297, 11-1-94; Ord. No. 3502, 5-9-17)