§ 1-18. Stormwater management impoundment structures or facilities.  


Latest version.
  • Stormwater management wet ponds and extended detention ponds that are not covered by the Impounding Structure Regulations (4VAC50-20) shall, at a minimum, be engineered for structural integrity for the 100-year storm event.

    (Ord. No. 3337, 4-22-14, eff. 7-1-14)

(Ord. No. 3337, 4-22-14, eff. 7-1-14)